Start a Conversation

Covers business structuring, regulatory approvals, entity setup and back-office operations — not SEBI-registered Investment Advisers. No advice on securities, stocks or mutual funds.

Plan & Build

The decision, then the delivery

GCC Ownership Models

One decision, four paths

Run It With Us

Live, and staying that way

India Investment Journey

From first advisory call to day-to-day operations

The intelligence behind every recommendation we make

Judgment from people who've run this, not just studied it

Government Incentive & Promotions

Government Incentives & Promotion - Accelor | We help you scale Globally

Capturing Every Incentive You Qualify For

Government Incentives & Promotion

The Money Left On The Table Is Rarely Reclaimed Later.

Production Linked Incentive schemes, state industrial policy, SEZ and export remission, single-window facilitation and government liaison — mapped against your specific investment before the entity is even structured, not discovered mid-project when a filing window has already closed.

Incentives Are Applied For. They Are Not Automatic.

  • Most schemes require registration or approval before commercial production begins — not after
  • Central and state incentives can typically be stacked, but the sequencing matters
  • Every scheme has a sunset date, a minimum investment threshold, or both
  • Missing an application window is rarely reversible once production has started
₹1.97L crPLI outlay across 14 manufacturing sectors
50%Typical fiscal support ceiling, capex-linked schemes
276Operational SEZs, $172B+ in FY25 exports
28States and UTs, each with its own incentive stack
7Incentive domains covered on this page

Incentives Reward Documented Compliance, Not Good Intentions

The Incentive You Qualify For Is Not The Incentive You Receive — Unless Someone Applies

India runs one of the world's most extensive industrial incentive architectures — a national PLI programme worth close to ₹2 lakh crore, 28 state industrial policies each competing for the same investment, a special economic zone network doing over $170 billion in annual exports, and an export remission toolkit that touches almost every HS code in the tariff schedule. Almost none of it is automatic. Every scheme carries its own registration window, minimum investment threshold, export obligation or sunset date — and the gap between "eligible on paper" and "incentive actually received" is where most of this value quietly gets left behind. This page maps the full architecture, not just the headline schemes, and goes into more depth on manufacturing and export incentives specifically than anything else on this site.

₹1.97L crTotal PLI outlay, 14 sectors, since 2020
Apr 2021SEZ income-tax holiday sunset — still misunderstood
0.3%–4.3%RoDTEP rate band, by HS code, on FOB value
₹1.25L crProposed ISM 2.0 outlay, semiconductor manufacturing
01

Domain 01 · Manufacturing

₹1.97 Lakh Crore, 14 Sectors, One Design Principle: Pay On Output, Not Promise

The Production Linked Incentive scheme pays a percentage of incremental sales above a base year — 4% to 20% depending on the sector — rather than subsidising capital expenditure up front. That design rewards factories that actually produce and export, not factories that only get built. Fourteen sectors are covered, from mobile manufacturing (the largest and best-performing tranche) to drones (the smallest). As of December 2025 the scheme had driven ₹20.41 lakh crore in production and ₹2.16 lakh crore in investment, though disbursement pace varies sharply by sector — electronics and mobile manufacturing are paying out on schedule, while several others are still in early execution.

SectorNodal MinistryOutlayIncentive Rate
Mobile manufacturing & electronic componentsMeitY₹40,951 cr4%–6% of incremental sales
Automobiles & auto componentsHeavy Industries₹25,938 cr13%–18% (higher for EVs)
High-efficiency solar PV modulesMNRE₹24,000 crCapacity-linked
Advanced Chemistry Cell (ACC) batteriesHeavy Industries₹18,100 cr~20% of capex equivalent
Pharmaceuticals (drug formulations)Dept. of Pharma₹15,000 crTiered by segment
Telecom & networking productsDept. of Telecom₹12,195 cr4%–7%
Textiles — MMF & technical textilesMinistry of Textiles₹10,683 crTiered by investment slab
Food processingMin. of Food Processing₹10,900 cr4%–15% depending on category
Critical drug intermediates & APIsDept. of Pharma₹6,940 cr5%–20%
Specialty steelMinistry of Steel₹6,322 cr12%–15%
White goods (ACs & LEDs)DPIIT₹6,238 cr4%–6%
Electronic / technology productsMeitY₹5,000 cr3%–5%
Medical devicesDept. of Pharma₹3,420 cr3%–5%
Drones & drone componentsCivil Aviation₹120 crUp to 20% of value addition

A closely related but separately administered programme sits alongside PLI: the India Semiconductor Mission. ISM 1.0 (₹76,000 crore, launched December 2021) has approved six projects with combined investment above ₹1.6 lakh crore — including the Tata-PSMC fab at Dholera and Micron's assembly-and-test plant at Sanand — offering up to 50% fiscal support on project cost. ISM 2.0, at a proposed outlay of ₹1.25 lakh crore, was cleared by the Expenditure Finance Committee and is pending Cabinet approval, with a first tranche of ₹1,000 crore already allocated in the FY27 Budget.

  • Sector and scheme eligibility screening against the specific product line
  • Base-year and incremental-sales threshold modelling
  • Application preparation & nodal-ministry liaison
  • Minimum investment & local value-addition compliance tracking
  • Annual disbursement claims & audit documentation
  • Semiconductor Mission (ISM) and Design Linked Incentive applications, where relevant
02

Domain 02 · State Competition

Twenty-Eight States Competing For The Same Investment, Each With A Different Offer

Central schemes like PLI are uniform nationwide; state industrial policy is where the real negotiation happens, and it varies enormously. Gujarat's newly-launched Viksit Gujarat Industrial Policy 2026 (targeting ₹10 lakh crore in investment over five years) introduced a "choose your incentive" model — businesses mix capital subsidy, interest subsidy and power tariff assistance to fit their own project economics, with MSMEs eligible for 35%–45% of fixed capital investment and priority sectors up to 50%. Tamil Nadu's 2021 policy still runs 15%–35% capital subsidy plus SGST refund and interest subvention for manufacturing MSMEs. Most large-state policies now separately reimburse net SGST paid — Gujarat's mega-industry scheme refunds 80%–100% of net SGST for up to 10 years, capped as a percentage of fixed capital investment per year based on location.

The trade-off that matters: the state offering the largest headline percentage is not always the best fit — Category-A talukas in Gujarat carry higher incentive ceilings than Category-B, and Tamil Nadu's IFI-topping infrastructure may outweigh a marginally lower subsidy rate. This is the same state-selection question this site's India Investment & Location Intelligence page scores independently — incentive stacking should follow the location decision, not drive it in isolation.
  • State policy comparison against your specific sector & investment size
  • Capital subsidy, interest subsidy & power tariff mix optimisation
  • Net SGST reimbursement structuring & annual claim filing
  • Taluka / district zone classification & ceiling verification
  • Mega / ultra-mega project threshold qualification
  • Multi-state incentive negotiation, run in parallel before site selection
03

Domain 03 · SEZ & Export

The SEZ Tax Holiday Most People Quote Expired In 2021 — The Real Toolkit Is Bigger Than That

Section 10AA of the Income Tax Act — the "100% tax exemption for five years, 50% for the next five" that most SEZ explainers still lead with — only applies to units that commenced production before 1 April 2021. New units set up after that date cannot claim it. What SEZ units still get: duty-free import of capital goods and inputs, exemption from CST and various state levies, GST treatment as zero-rated exports, and a single-window approval mechanism through the Development Commissioner and Approval Committee. A new, genuinely current benefit for FY27: a one-time concessional DTA sales reform introduced in the Union Budget 2026-27 lets eligible SEZ manufacturing units sell into the domestic market at concessional customs rates through 31 March 2027 — a meaningful change for capacity utilisation that has nothing to do with the expired tax holiday. Separately, export incentives apply whether or not the entity sits inside an SEZ.

SchemeWhat It DoesCurrent Status
RoDTEP — Remission of Duties & Taxes on Exported ProductsRefunds embedded, non-creditable central/state/local taxes (fuel duty, mandi tax, electricity duty) as e-scrips, 0.3%–4.3% of FOB value by HS codeExtended to 30 Sep 2026 at full rates; goods-only, 10,000+ HS codes covered
Duty DrawbackRefunds customs & excise duty paid on inputs used in exported goods, at All Industry Rates revised annuallyCannot be claimed on the same duty component as RoDTEP
EPCG — Export Promotion Capital GoodsZero customs duty on capital goods import, against an export obligation of 6x the duty saved, over 6 yearsFTP 2023; EO deadlines auto-extended to 31 Aug 2026 amid trade disruption
Advance AuthorisationDuty-free import of inputs physically incorporated into export products, per Standard Input-Output Norms (SION)18-month fulfilment window; same EO extension applies
SEZ Act, 2005Duty-free enclave status, GST zero-rating, single-window clearance, 100% FDI via automatic routeSection 10AA tax holiday closed to units after 1 Apr 2021; DESH Bill replacement still not enacted
Sequencing matters more than any single scheme: RoDTEP and Duty Drawback cannot both apply to the same duty component, EPCG's export obligation has to be modelled against realistic production ramp-up before the capital goods are even imported, and an SEZ location decision made purely on the assumption of a still-active tax holiday will be built on a five-year-old fact.
  • RoDTEP rate lookup & e-scrip claim management via ICEGATE
  • Duty Drawback vs. RoDTEP election, by product line
  • EPCG application & export obligation modelling
  • Advance Authorisation & SION-based input-output ratio filing
  • SEZ unit registration & positive Net Foreign Exchange (NFE) tracking
  • Concessional DTA sales structuring under the FY27 reform window
04

Domain 04 · Employment & R&D

The Newest Incentive Layer Rewards Hiring And Research, Not Just Capital

Two schemes extend the incentive architecture beyond capital expenditure and exports. The Employment Linked Incentive Scheme — Cabinet-approved July 2025 with a ₹99,446 crore outlay, operational guidelines notified in April 2026 — routes benefits through EPFO: first-time employees earning up to ₹1 lakh a month receive one month's EPF-equivalent wage (up to ₹15,000) in two instalments, while employers hiring at least 2–5 additional workers (depending on existing headcount) receive per-employee monthly incentives, with an extended benefit window for manufacturing specifically. Separately, several state industrial policies — Gujarat's 2026 policy among them — now fund R&D directly: up to 50% capital subsidy (capped around ₹250 crore) for qualifying research centres meeting a minimum investment threshold, a meaningfully different lever from the older, narrower weighted-deduction R&D tax treatment.

  • ELI Scheme employer-incentive eligibility & headcount threshold modelling
  • EPFO registration & first-time-employee benefit administration
  • Manufacturing-sector extended benefit window qualification
  • State-level R&D capital subsidy applications, where available
  • Direct Benefit Transfer (DBT) & Aadhaar-linked disbursement setup
05

Domain 05 · Liaison

Invest India Opens Doors. Someone Still Has To Walk Through Each One.

Invest India — the national investment promotion agency, jointly set up by DPIIT, industry associations and state governments — provides sector guidance, facilitates introductions to ministries, and can accelerate specific approvals for significant investments. Every state runs its own parallel promotion agency with its own relationship map and incentive negotiation authority. Neither replaces the day-to-day filing work — they open relationships and unblock specific stuck approvals; the applications, documentation and follow-through still have to be run project by project.

  • Invest India engagement & sector-desk relationship management
  • State investment promotion agency liaison, run in parallel across shortlisted states
  • Ministry-level escalation for significant or stalled investments
  • Incentive negotiation support alongside state industrial policy teams
  • Investor facilitation cell coordination for large or strategic projects
06

Domain 06 · Ease Of Doing Business

One Portal That Knows What You Need — Not One Portal That Grants It Automatically

The National Single Window System, run jointly by DPIIT and Invest India since its September 2021 launch, does two genuinely different jobs. The first — "Know Your Approvals" — answers the harder question for a first-time investor: which of roughly 248 government-to-business clearances, across 26 central ministries and 16-plus states, actually apply to this specific business. The second lets you apply for and track many of those approvals through a single login instead of two dozen separate departmental portals. It has processed well over 75,000 approvals since launch. What it does not do is grant anything automatically, or replace the state-specific portals that still run certain clearances (labour, factory licensing, pollution control) on their own separate systems in several states.

  • Know Your Approvals (KYA) mapping for the specific entity & sector
  • NSWS application submission & cross-department tracking
  • State-specific portal filings, where NSWS integration is incomplete
  • Document repository management across every linked approval
  • Query response & resubmission handling on stalled applications
07

Domain 07 · Coordination

Central Approvals And State Approvals Run On Different Clocks — Someone Has To Keep Both Moving

A single manufacturing project routinely needs central-level sign-off (environmental clearance, sector licensing, FDI conditionality) running alongside state-level approvals (factory licence, pollution control board consent, electricity connection, building plan sanction) that follow entirely different timelines, portals and offices. Neither government layer is responsible for keeping the other moving, and a stalled state approval can hold up a central one that is otherwise ready to issue — or the reverse. This is the coordination work that sits underneath every other domain on this page: tracking every open approval across both layers on one register, with a named owner and a realistic date, rather than discovering the gap when a filing deadline has already passed.

  • Unified approval register — central & state, one tracked timeline
  • Dependency mapping between central and state sign-offs
  • Escalation management when one layer stalls the other
  • Deadline tracking across every scheme's own sunset or renewal date
  • Post-approval compliance monitoring, so incentives aren't clawed back later

Let's Talk

Which Of These Are You Actually Leaving On The Table?

Tell us the sector, the state, and the investment size — we'll map every central and state incentive you qualify for, and the filing sequence that gets you all of them.

Start a Conversation →